ALL NODES NOMINAL FLEET PUE 1.06 GRID DRAW 0.00 MW CARBON INTENSITY 0 g/kWh DOC REV 2026.08 SITE CONSULTATION →

Sheet 00 / General Arrangement

Sovereign AI Infrastructure Powered by Hybrid Sources

Deploy high-density GPU supercomputing and petabyte-scale storage directly at renewable energy assets. Zero carbon, zero grid delay, military-grade security.

Deployment
3mo
Rack density
50kW
Grid carbon
0g
Ops coverage
24/7
Orthographic side elevation of the 40ft GreenCore AI Supernode A1A2A3 B1B2B3 MV 12 192 mm / 40 ft HC 2 896 mm 01DRY COOLERS 02HGX COMPUTE BAY 03CDU + PUMPS 04BTM TIE-IN
DWG-GCAI-40-SN / REV C SCALE 1:75 SIDE ELEVATION

Sovereign, mobile, and energy-efficient AI infrastructure, deployed where network capacity and traditional construction are insufficient.

Our business value

  • 01Faster deployment
  • 02Local data control
  • 03Energy independence
  • 04Predictable costs
  • 05Reduced dependence on major cloud providers
  • 06Ability to deploy in remote or strategic locations

Sheet 01 / Design Thesis

The infrastructure
bottleneck is over.

Traditional data centers are slow to build, constrained by overloaded power grids, and powered by fossil fuels. GreenCore AI rewrites the playbook. We engineer modular, liquid-cooled, high-density AI nodes that deploy in weeks, not years directly at the fence line of solar, wind and hydro assets.

01

Behind the Meter

100% green energy

Nodes are sited inside the perimeter of the generation asset. Power flows from inverter to rack without ever touching a public grid connection.

  • InterconnectDirect MV tie-in
  • Grid queueBypassed
  • Scope 20 gCO₂/kWh
02

Direct to Chip

Liquid cooling

Cold plates mounted on the die. Heat leaves the rack as liquid, not air, which is the only way 500 kW fits inside a shipping container.

  • PlatformNVIDIA H100 / B100
  • LoopClosed, glycol
  • Design PUE≤ 1.08
03

Sovereign & Secure

24/7 managed SOC

Full data residency, end-to-end encryption and a physically hardened envelope, watched around the clock by our own security operations center.

  • ResidencyIn-territory
  • EncryptionEnd-to-end
  • MonitoringSOC + NOC 24/7

Time-to-first-token

Years of permitting, or one quarter.

Hyperscale buildgrid-tied, greenfield
36–48 months
Colocation retrofitsubject to queue
18–24 months
GreenCore nodebehind-the-meter
3 months

Indicative schedules from contract signature to production workload, assuming an energized host asset.

Sheet 02 / Product Lineup

Modular compute & storage
nodes built for extremes.

HOT AISLE + COOLANT MAINS CDU + SWGR 12 192 2 438 PLAN / 40FT AI SUPERNODE / 16 RACK POSITIONS
40 FT

GreenCore AI Supernode

Massive AI training, LLMs, neural networks & deep learning.

Primary focusAI training · LLM pre-training · deep learning
Power envelopeUp to 500 kW high-density deployment
CoolingDirect-to-chip liquid, closed loop + dry-cooler array
ComputeNVIDIA HGX H100 / B100 / B200
PlatformsDell PowerEdge XE9680 · R760xa
Ambient range−30 °C to +55 °C
Form factor40 ft high-cube ISO, skid-mounted
Power density500 kW
Liquid-cooled fraction92%
Design PUE1.06

Sheet 03 / Sizing & Impact

Size a node.
See what it displaces.

Set the capacity you need and how the site is powered. The model returns the carbon avoided against a grid-tied build of the same size, the energy cost basis, and how much sooner the workload runs. Every assumption is listed below and open to review.

How much computing power you want to run. One 40 ft Supernode carries up to 500 kW.

Power source

Sets the grid carbon intensity and the industrial power price used for both sides of the comparison.

Heavy means the machines are running near their limit around the clock. Averages about 85% of full power over the year.

Configuration: 4 × 40 ft Supernode

CO2 avoided per year

8 596t

Equivalent to taking 1 869 cars off the road

Facility energy drawn
15 786MWh/yr

vs 23 232 MWh grid-tied

Energy cost basis
0.71M€/yr

vs 3.48 M€ grid-tied

Time to first workload
3months

33 months earlier than a grid-tied build

Design PUE
1.06vs 1.56 industry

32% less cooling & distribution overhead

Assumptions & sources indicative model, every constant open to review

This model is indicative and intended for early sizing conversations, not for contractual or financial reporting. The constants live in one block at the top of assets/js/calculator.js and are meant to be replaced with project-specific figures.

Parameter Value used Basis
Grid carbon intensity (Bulgaria)370 gCO2/kWhEmber Electricity Review
Grid carbon intensity (EU average)242 gCO2/kWhEmber Electricity Review
Grid carbon intensity (Germany / Poland)380 / 662 gCO2/kWhEmber Electricity Review
Industrial power price (Bulgaria)120 €/MWhIncl. network charges & levies
Industrial power price (EU average)150 €/MWhIncl. network charges & levies
Industrial power price (Germany / Poland)180 / 140 €/MWhIncl. network charges & levies
PUE (grid-tied comparator)1.56Uptime Institute global survey
PUE (GreenCore node)1.06Design figure, direct-to-chip liquid
Generation LCOE (solar / wind / hydro)45 / 48 / 52 €/MWhEU utility-scale range
Passenger car emissions4.6 tCO2/yrUS EPA equivalency
Comparator build schedule36 monthsGrid-tied greenfield, incl. connection queue

Reference design

SOF-04: 500 kW in Solar

A worked example of a single node sited at a solar park, showing how the power, cooling and connectivity fit together end to end.

Integration schematic: generation asset through a power purchase agreement and behind-the-meter tie-in to the GreenCore node, with the public grid connection queue off the critical path PUBLIC GRID / TSO CONNECTION QUEUE NOT ON THE CRITICAL PATH 01 GENERATION ASSET Solar park, 500 kW 02 BTM TIE-IN MV switchgear on site 03 GREENCORE NODE 40 ft Supernode, liquid 04 SOVEREIGN WORKLOAD Dark fibre, in-country PPA MV FIBRE COOLANT LOOP RETURN / RECOVERABLE HEAT
DWG-GCAI-REF-SOF04 / REV A INTEGRATION SCHEMATIC WORKED EXAMPLE
Allocated capacity
500 kW
Host asset
Solar PV, ~4 MWp
Node
1 × 40 ft Supernode
Commercial basis
Behind-the-meter PPA
Grid import
Backup only
Modelled schedule
3 months to production

Sheet 04 / Managed Service

From factory to zero-day
operation. We handle everything.

Building next-generation AI infrastructure shouldn't create operational headaches. GreenCore AI delivers a complete turnkey managed solution.

01PRE-SITE

Fully managed commissioning

Hardware integration, network build and liquid-cooling calibration are completed and burn-in tested in our factory, before the node ever ships.

  • Rack & stack, cabling, structured fibre
  • Loop fill, pressure & leak certification
  • 72-hour full-load burn-in
02RUNTIME

24/7 predictive monitoring

Our NOC watches thermal levels, coolant pressure and chip performance in real time, flagging drift long before it becomes downtime.

  • Per-rack thermal telemetry
  • Pressure & flow anomaly detection
  • Guaranteed uptime SLA
03DEFENDED

Military-grade cybersecurity

Defended by our dedicated in-house SOC. Active threat hunting, encrypted pipelines and physical hardening protect your sovereign workloads.

  • Active threat hunting, human-led
  • Encrypted pipelines, key custody in-territory
  • Tamper-evident physical envelope

Sheet 05 / Connectivity

No fibre? No problem.

A node needs power and a link. Power you already have, which is the whole point of siting at the generation asset. For the link, every node can be specified with a satellite uplink, so the site does not have to wait on a trench. If there is sky, there is a connection.

Connectivity schematic: the node links upward to a low-earth-orbit satellite constellation and down to a ground station, with terrestrial fibre shown as an optional parallel path LOW EARTH ORBIT CONSTELLATION 01 GREENCORE NODE At the generation asset 02 GROUND STATION Peering into your network TERRESTRIAL FIBRE, BONDED WHERE IT EXISTS
DWG-GCAI-LINK / REV A CONNECTIVITY SCHEMATIC

Desert solar

Hundreds of megawatts of generation, no telecom infrastructure for a hundred kilometres. The node lands next to the inverters and links up, not out.

Vessels and platforms

A ship mid-ocean or an offshore rig has power and a deck. Processing telemetry and sensor data on board beats hauling raw feeds to shore.

Remote extraction

Mines and well pads already run generation. Add compute and the site stops shipping data to a distant facility just to get an answer back.

Uplink
LEO satellite terminal
Typical latency
25 to 60 ms
Terrestrial
Bonded where available
Failover
Automatic, either direction

Satellite is specified per site against the workload. Training runs that stay inside the node need very little of it; anything that streams results out continuously needs more, and that sizing is part of the site consultation.

Sheet 06 / Deployment Sectors

Built for mission-
critical workloads.

01

National sovereignty & governments

Keep data local.

ISOLATED · GRID-INDEPENDENT

Fully isolated, grid-independent infrastructure that satisfies strict data residency law. No shared tenancy, no cross-border replication, no external dependency on a public grid connection that can be constrained or contested.

  • In-territory key custody
  • Air-gap capable
  • Sovereign operator handover
02

Space & aerospace

Edge ground stations.

TELEMETRY · HIGH THROUGHPUT

Real-time satellite telemetry and high-throughput downlink processing performed directly at the ground station, so raw passes are reduced to products on site instead of being hauled across a backhaul link.

  • Downlink-adjacent compute
  • Petabyte pass archive
  • Deployable to remote apron sites
03

Enterprise & LLM developers

Lowest-in-market LCOE.

TRAINING · SCALE-OUT

Train massive models against the lowest levelized cost of energy on the market. Power purchased at the generation asset, not at the retail meter, and capacity that scales by adding nodes, not by rejoining a queue.

  • Behind-the-meter energy pricing
  • Linear scale-out by node
  • Reserved or burst allocation
04

Mining & energy

Turn spare generation into revenue.

CURTAILMENT · REMOTE SITES

Producers curtail power when the grid cannot take it, and remote extraction sites often sit on generation with nowhere to sell it. A node placed at the asset converts that spare output into compute capacity you can sell, without waiting on a grid upgrade or a new offtake agreement.

  • Monetise curtailed output
  • Load that follows generation
  • Deployable at remote extraction sites
05

Wider industry

Heavy, sensitive or power-hungry workloads.

REGULATED · DATA-INTENSIVE

The same node suits any workload that is compute-heavy, data-resident or awkward to host. Healthcare and genomics, financial risk and simulation, media rendering, research and HPC, manufacturing digital twins, telecoms. If the constraint is power, latency or where the data is allowed to sit, the answer is usually the same shape.

  • Healthcare & genomics
  • Financial risk & simulation
  • Media, rendering & VFX
  • Research & HPC
  • Manufacturing digital twins

Sheet 08 / Engagement

Ready to power your
next AI breakthrough?

Stop waiting for grid approval. Bring your compute directly to the green power source.

Schedule a site consultation